معدات إزالة التلوث للموظفين والمواد
Personnel ضباب إزالة التلوث دش
A controlled exit chamber that applies fine water droplets to bind loose powder on protective garments before de-gowning.
- Fine-Droplet Suit Coverage
- Interlocked Door Sequence
- Drainable Stainless Interior
- Programmable Misting Cycle
مقدمة المنتج
This walk-through misting shower places a distributed nozzle array around an operator leaving a powder-handling suite. Fine treated-water droplets wet the outer garment surface with limited runoff, while a sloped floor collects the resulting liquid. Smooth stainless internal surfaces, coved corners and a sealed two-door route support cleaning between shifts.
الخصائص الرئيسية
A controller sequences entry lock, misting, drip delay and exit release.
Pressure and water-supply monitoring can inhibit a cycle when utility conditions are unsuitable.
A non-slip floor pan directs liquid to a trapped drain connection.
Visible cycle indicators guide the operator through rotation and completion.
مخاوف المنتج للعملاء
The chamber must wet loose residue consistently while keeping water use and carryover manageable.
Dry powder can become airborne during suit removal.Fine droplets bind loose residue to the outer garment before de-gowning.
Arms and boots receive less water than the front of the suit.Multi-level nozzles and an operator rotation prompt extend coverage around the wearer.
Residual water causes slips and delays the next user.A graded non-slip floor and drain-down pause remove runoff before door release.
Both doors are opened during a decontamination cycle.Electrical interlocking keeps the opposite doorway secured until the cycle ends.
تطبيقات نموذجية
High-potency pharmaceutical exitsAPI powder productionContainment laboratory de-gowningBattery-powder handling rooms
المعلمات الفنية
Typical hygienic enclosure ranges for a personnel misting shower are listed below.
| المواد الأساسية | PIR-insulated SUS 304 or SUS 316L chamber with treated-water manifolds and atomising nozzles |
|---|---|
| سمك اللوحة | 50-75 mm insulated wall and ceiling panels |
| العرض الفعال | 900-1200 mm clear internal width |
| الحد الأقصى الطول | Up to 1800 mm chamber length |
| الصلب يواجه سمك | 1.0-1.5 mm stainless-steel internal facing |
| الكثافة الأساسية | 40-45 kg/m³ closed-cell PIR insulation |
| الموصلية الحرارية | 0.021-0.026 W/(m·K) for the insulated enclosure core |
| إنهاء السطح | Brushed stainless steel with welded coved corners and a non-slip drain floor |
| نوع المشترك | Liquid-tight flush seams with gasketed interlocked doors and sanitary welded pipe connections |
| التخصيص | متوفر على أساس التطبيق المقصود وبيئة التشغيل. |
الخيارات المتاحة
Water-quality monitoringAir-assisted atomising nozzlesEmergency rinse functionTwo-person chamber arrangement
Planning a Personnel Misting Decontamination Shower specification?
أرسل لنا الأبعاد الخاصة بك، شروط التثبيت، أهداف الأداء والتشطيب السطحي المطلوب.

English
الألمانية
العربيةالحالي
الفرنسية
الإندونيسية
اليابانية
الكورية
اللغة الملاوية
البرتغالية
الروسية
الإسبانية
التايلاندية
اللغة التركية
اللغة الفيتنامية