Прогулка через воздушный душный тоннель в чистой комнате

An extended modular passage that exposes walking personnel to successive filtered-air jet zones, reducing queues at high-volume cleanroom entrances.
  • Continuous Walking Route
  • Sequential Cleaning Bays
  • Scalable Tunnel Length
  • Shift-Change Throughput
Запрос котировки Просмотреть продукты

Введение продукции

The tunnel arranges a sequence of cleaning bays so operators continue walking while receiving repeated directional airflow. Each bay can contain its own blower, filter, nozzle wall and low-level return route, helping maintain coverage through the complete passage. Modular sections allow the cleaning distance to suit planned walking speed and entry volume.

Основные характеристики

Successive nozzle bays extend cleaning exposure along the walking route.

Dedicated fan-filter modules avoid a long common pressure path.

Low-level returns run continuously along the tunnel to remove released particles.

Panelised bay sections make it possible to extend the passage in stages.

One-way indicators can support orderly high-volume personnel flow.

Обеспокоенность клиентов продуктами

A continuous system must give personnel sufficient exposure time without allowing cleaning airflow to decay at the far end of the route.

Fast walkers receive too little cleaning exposure.Tunnel length and active-zone count can be selected for the planned walking speed.
A central blower loses pressure over a long passage.Each bay uses a short dedicated pressure loop with its own fan and final filter.
Released dust travels toward the clean exit with continuous traffic.Distributed returns remove contamination within each cleaning bay.
A long enclosure is difficult to bring into an existing building.Panelised modules can be transported separately and joined at the installation location.

Типичные приложения

Semiconductor shift entryLarge electronics plantsPharmaceutical campus gowningHigh-volume food hygiene entrances

Технические параметры

Common modular construction ranges for a walk-through personnel tunnel are listed below.

Основной материалRepeated powder-coated steel cleaning bays with centrifugal fans, H13 HEPA filters and adjustable stainless nozzles
Толщина панели50 mm insulated modular wall sections
эффективная ширина900-1500 mm clear walking passage width
Максимальная длинаUp to 10000 mm assembled tunnel length using repeated modules
Толщина линий стали1.0-1.2 mm formed steel facing with reinforced module junctions
Плотность ядра45-65 kg/m³ composite insulation and acoustic infill
Теплопроводимость0.029-0.038 W/(m·K) for the selected modular panel core
Поверхностная отделкаContinuous white cleanroom powder coating with stainless wear trim
Объединенный типGasketed bolted tunnel-bay joints with aligned nozzle plenums and sealed return channels
CustomizationДоступно в зависимости от предполагаемого применения и операционной среды.

Доступные варианты

Two to ten cleaning modulesContinuous or zoned fan operationOne-way traffic indicatorsEmergency side-exit modules

Planning a Walk-Through Cleanroom Air Shower Tunnel specification?

Отправьте нам ваши габариты, условия монтажа, целевые показатели производительности и требуемую отделку поверхности.

Поговорите с нашей командой
Электронная почта WhatsApp WeChat

Главная

Продукция

Новости

О нас

Контакты