Combination Eyewash and Safety Shower
- Eye and Body Flushing
- Independent Stay-Open Controls
- Protected Twin Nozzles
- Visible Integrated Station
Product Introduction
The combination unit mounts an emergency eyewash receptor and overhead drench shower on one supply frame. The eyewash push flag and shower pull rod operate separate stay-open valves, allowing either function or both to run as the incident requires. Common inlet piping reduces installation complexity, while individual flow controls and optional alarm switches preserve functional monitoring.
Key Features
Independent controls prevent one function from delaying the other.
Covered eyewash heads and a broad shower head provide controlled flushing patterns.
A rigid corrosion-resistant frame keeps activation points in fixed visible positions.
Customer Product Concerns
Chemical areas may require eye-only or full-body response, yet emergency equipment must remain simple to identify and operate under stress.
Typical Applications
Technical Parameters
Typical construction values for a free-standing combination station are shown below; simultaneous flow demand and tempered water are coordinated with the emergency-water system.
| Core Material | Galvanized steel or 304/316L stainless frame with stainless eyewash receptor |
|---|---|
| Panel Thickness | 2.0-3.0 mm riser pipe wall |
| Effective Width | 700-900 mm complete station envelope |
| Maximum Length | Up to 2500 mm overall height |
| Steel Facing Thickness | 1.0-2.0 mm stainless receptor and signage surfaces |
| Core Density | 7850-8000 kg/m³ for steel structural parts |
| Thermal Conductivity | 14-60 W/(m·K) according to steel grade |
| Surface Finish | Safety-green coating or satin stainless with colored controls |
| Joint Type | Threaded or flanged common inlet with independent stay-open branch valves |
| Customization | Available based on the intended application and operating environment. |
Available Options
Planning a Combination Eyewash and Safety Shower specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.
EnglishCurrent
德语
阿拉伯语
法语
印尼语
日语
韩语
马来语
葡萄牙语
俄语
西班牙语
泰语
土耳其语
越南语